Water Treatment Plant Site Slope Stabilization Project, LB 17-03

WE ARE NAPA COUNTY

Construction of a soldier pile wall at the LBRID Water Treatment Plant to stabilize a bank that failed during the January 2017 storm events. Contractor shall possess a Class A license at the time of contract award. The Engineer's estimate for construction of the base contract is $217,250. Print, view, or download Notice to Contractors. Print, view, or download Specifications. Print, view, or download Plans. Print, view, or download Addendum 1 12-01-17. Print, view, or download Sign In Sheets.