The project is located at 2446 Stagecoach Canyon Road, Pope Valley, CA 94567, within the Lake Berryessa Resort Improvement District (District).  The project is located beneath the District's water treatment plant and next to the District's main wastewater collection tank.  This work includes, but is not limited to, furnishing all labor, equipment, materials, and supplies for construction of a soldier pile along the District's raw water intake structure along the downslope side of the access road to the District's wastewater facility.  This work also includes the construction of a geogrid reinforced earthen berm on the upslope of the road and removal and replacement of a drainage culvert system.  The Project is under Evaluation/Review.

Contract

Contractors shall possess a Class A at the time of contract award. The Engineer's estimate is $352,800.

Bids

Contractor Location Total Base Bid
ETIC Pleasant Hill, CA $347,342.00
Suulutaaq, Inc. Suisun City, CA $386,275.00
Rege Construction Cloverdale, CA $399,923.00
Team Ghilotti Petaluma, CA $455,641.50
Valentine Corp. San Rafael, CA $512,369.00
Hess Construction American Canyon, CA $533,964.00
Hillside Drilling Richmond, CA $543,280.00
Cats 4 U Healdsburg, CA $546,836.00