Water Treatment Plant Site Slope Stabilization Project, LB 17-03

Overview

Construction of a soldier pile wall at the LBRID water Treatment Plant to stabilize a bank that failed during the January 2017 storm events.  

Contract

Contractor shall possess a Class A license at the time of Contract award.  The Engineer's estimate for construction of the base contract is $217,250.

Bids

Contractor Location Total Base Bid
Suulutaaq Suisun City, CA $199,770.00
Hess Construction American Canyon, CA $225,023.00
Valentine Corporation San Rafael, CA $234,369.00
Cats 4 U Healdsburg, CA $253,345.00
Rege Construction Cloverdale, CA $257,767.00
Team Ghilotti Petaluma, CA $324,685.00
Swan Engineering Rocklin, CA $349,825.00