Milton Road Flap Gate Project, PW 18-21

Overview

  • Status: Construction
  • Contact: Andrew Butler
  • Publish Date: July 9, 2018

  Description of Work

The project is located at a tidal double 72"X72" box culvert which passes under Milton Road near the 1300 block of addresses.  The culvert connects a drainage ditch to the Napa River.  The culvert is fitted with a set of flap gates on the Napa Riverside and a trash rack on the ditch side.  This project consists of removing and replacing the two flap gates.  The new flap gates will be provided by Napa County.  The culvert barrels will have to be plugged during replacement to prevent flooding of private land during construction.

Contract

The Contractor shall possess a Class A license at the time of contract award.  The Engineer's estimate is $125,160.  The bid opening sheet has been posted in Documents below.  The project was awarded to Harbor Offshore for $125,750.