Silverado Trail MPM 18.04, RDS 18-17

2017 Storm Damage Repair - Retaining Wall 

County Project #S7114-31140 DAF #PMP-NAPCO-001-0

Overview

Project Scope

This project is located at Silverado Trail MPM 18.04 in Napa County.  The proposed repair to the slide is a drilled hole steel soldier pile concrete retaining wall approximate 280' long.  The wall height varies from approximately 5' to 23'.

Contract

Contractor shall possess a Class "A" License at the time of contract award.  The Engineer's Construction estimate for this project is $2,000,000.

Bid Documents

The Bid Documents may be obtained at said office by prospective bidders, for a fee of ten ($10) per CD, which fee is not refundable.  There is a mandatory pre-bid meeting.  Both Mandatory sign in sheets have been posted. 

Job Walk location: Silverado Trail Mile Post at intersection with Pratt Avenue. Please enter Pratt Avenue from Highway 29 just north of St. Helena and drive to Silverado Trail and park just before the bridge.  Addendum 1 and 2 have been added.