Dry Creek Road Bridge over Dry Creek Replacement Project, RDS 15-22

Overview

Project Scope

The project is 0.8 miles west of Mt. Veeder Road and consist of replacing the existing bridge at a sharp curve in Dry Creek Road.  The proposed bridge structure would consist of an approximately 80-foot-long by 32-foot-wide single-span concrete slab bridge that is constructed on pre-cast and pre-stressed concrete girders.  The project also includes 900 feet of new roadway to remove two curves in Dry Creek Road.  If the County can complete the regulatory permit process and right-of-way acquisitions before 2023, then it is possible that construction could begin in 2023.  There is significant competition for federal Highway Bridge Program funding and it is anticipated that construction could begin in 2025.

Project Plans