2023 Berryessa Improvements Project

Overview

  • Status: Bidding
  • Contact: Sydney Diede
  • Publish Date: March 16, 2023

Project Scope

The 2023 Berryessa Improvements Project will provide road rehabilitation efforts within two (2) subdivisions (the Berryessa Highlands and the Berryessa Pines), Steele Canyon Road, Berryessa Knoxville Road, and Spanish Flat Loop Road. The treatments at each location vary from seals to overlays and are specified on the Plans and Specifications. The County will resurface 24 roadways within the Berryessa Highlands (including the portion of Steele Canyon Road from Steele Resort Road to the end) and three (3) roadways within the Berryessa Pines. There are 8.1 miles of Berryessa Knoxville Road that will be sealed, between Spanish Flat Loop Road and Pope Canyon Road. Additionally, all of Spanish Flat Loop Road will be overlayed.

    RDS 22-05: Berryessa Knoxville Road FLAP 1 Resurfacing

    RDS 23-05: Berryessa Pines Resurfacing

    RDS 23-05: Spanish Flat Loop Road Resurfacing

    RDS 22-13: Berryessa Highlands Resurfacing

    RDS 23-16: Steele Canyon Road Resurfacing

Contract

Each bidder must be licensed as required by law.  Contractor shall possess a Class A or C-12 License at the time of contract award. Revised Engineer estimate for base bid is: $6,500,000 listed in Addendum 1.

Addendum 1 has been added.

Project Map

2023 Berryessa Improvements Project