2023 Berryessa Improvements RDS 22-05, 22-13 and 23-05

Overview

  • Status: Design
  • Contact: Sydney Diede
  • Publish Date: December 1, 2022

Project Scope

The 2023 Berryessa Improvements Project will provide road rehabilitation efforts within two (2) subdivisions (the Berryessa Highlands and the Berryessa Pines), Berryessa Knoxville Road, and Spanish Flat Loop Road. The treatments at each location are currently under design. The County will provide treatment to 24 roadways within the Berryessa Highlands and three (3) roadways within the Berryessa Pines. There are 8.1 miles of Berryessa Knoxville Road that will be sealed, between Spanish Flat Loop Road and Pope Canyon Road. Additionally, all of Spanish Flat Loop Road will be treated.  

Project Map

2023 Berryessa Improvements Project

Bid Documents

No bid documents are available yet.