Overview
- Status: Awarded
- Contact: Jim Reese
- Publish Date: April 4, 2023
Project Scope
The Mt. Veeder Road, MPM 3.75 project consists of replacing the damaged road with a 100-foot-long cast-in-place drilled hole pile supported retaining wall along with permanent tiebacks 6 feet below ground, where significant slide occurred that will restore lateral support to the outboard edge of roadway and allow fill placement where approximately 80 feet of the westbound travel lane dropped up to 20 feet due to slide movement. The grade beam is eight to twenty feet high. Relatively closely spaced piles will transfer lateral soil loads to deeper and stronger materials. The permanent tiebacks is 6 feet below ground will make it feasible for this high wall to carry the load. A 45 feet long temporary wall is located at the edge of the slide to allow the contractor to install the permanent wall safely. Filling and repaving the roadway will be required to restore the asphalt surface and pre-slide drainage patterns.
Engineer's estimate is $1,000,000. Contractor shall possess a Class A or C-12 license at the time of contract award.
Bid Documents
The plans and specifications are available for viewing or download. Addendum 1 has been added. The planholder's list has been added. The bid opening was May 4, 2023 at 11:30 AM. The sublists have been posted. The project was awarded by the Board of Supervisors on May 16, 2023 to E.E. Gilbert for their low base bid of $1,016,792.
Plans and Specifications
Contractor | Total Base Bid |
---|---|
E.E. Gilbert Construction, Inc. - Martinez, CA | $1,016,946.15 |
Viking Construction Company - Rancho Cordova, CA | $1,350,525.00 |