Napa County - Airport Terminal Area Redevelopment Phase I, PW 23-29R

Overview

Project Scope

Description of Work: Airport Terminal Area Redevelopment Phase I. There are three (3) Bid Schedules included for this Project. The scope of work for each consists of the following:

  • Bid Schedule A – Electrical Improvements
  • Bid Schedule B – Sanitary Sewer Improvements 
  • Bid Schedule C – Terminal Building Demolition 

Engineer’s Cost Estimate: The estimated cost of construction for this Project is listed below for each Bid Schedule.

  • Bid Schedule A: $1,053,160
  • Bid Schedule B: $365,600
  • Bid Schedule C: $327,500

The Contractor shall possess a Class A License at the time of contract award.

Bid Documents

The bid documents are available for viewing and download below. Pre-bid meeting sign in sheet posted. Addendum 1 has been added. The original Bid Tabulation has been posted from PW 23-29 Napa County Airport - Airport Terminal Area Development Phase 1 from July 2023. From Previous Bid: Contractor Team sublist has been posted. The bid opening was 09/21/23, the project is under Evaluation/Review. The sublists and the bid sheet are posted.