Bid Number: RDS 19-05
Bid Title: Zinfandel Lane Paving
Category: Construction, Roads and Public Works
Status: Closed

Description:

The project is located on Zinfandel Lane in Napa County. The extents of resurfacing on Zinfandel Lane is as shown per plan, between State Route 29 and Silverado Trail.

The proposed project will consists of the placement of a 2.5 inch thick layer of rubberized asphalt, gap graded (RHMA-G) over Zinfandel Lane, including grinding and all other related work. The restriping pattern will be as shown on the plans.

The work shall be conducted during favorable weather with no ambient temperatures less than 55 degrees F. The Additive Alternate #3 scope is shown per attached plan and specs.

The Engineer’s estimate is $1,201,795.  Addendum 1 and 2 have been added.  The Project is under Evaluation/Review. The 3 lowest sublists have been posted.

We wish to offer the ability to view the bid opening remotely, instructions to do so are in Addendum 2.

Contractor Base Bid Ded Alt 1 Add Alt 2 Add Alt 3
Ghilotti Construction - Santa Rosa    $822,297.40   ($33,270.00) $48,000.00 $331,834.00
Granite Construction - Ukiah    $860,522.14   ($30,674.94) $50,000.00 $275,605.00
Martin Brothers - Sacramento    $903,116.40   ($33,270.00) $27,500.00 $218,210.00
Argonaut Constructors - Santa Rosa    $938,241.15   ($29,943.00) $46,700.00 $381,885.00
Ghilotti Brothers - San Rafael    $940,792.40 ($496,554.75) $14,000.00 $235,329.50
Team Ghilotti $1,132,959.90   ($33,270.00) $82,865.00 $543,961.00

Publication Date/Time:
3/19/2020 11:00 AM
Publication Information:
NV Register
Closing Date/Time:
4/16/2020 11:30 AM
Contact Person:
Sonja.El-Wakil@countyofnapa.org
Sonja El-Wakil
Qualifications:
The Contractor shall possess a Class A or C-12 license at the time of contract award.
Related Documents:

Return To Main Procurement Page